1. Home
  2. Jobs
  3. Branch of Sterling and Wilson Data Center Private
  4. HVAC Site Engineer (Data Center Construction)
Cybersecurity

HVAC Site Engineer (Data Center Construction)

Branch of Sterling and Wilson Data Center Private
Riyadh, Saudi Arabia Listed 1h ago via Naukrigulf

Job Overview

Company Industry ConstructionCivil Engineering
Department / Functional Area Site EngineeringProjects
Keywords Senior HVAC Site SupervisorCritical Facilities HVAC EngineerProject EngineeringChillersData Center

Supervise and execute HVAC works as per approved drawings, specifications, method statements and project schedule. Manage installation of AHUs, FCUs, CRAC/CRAH units, chillers, pumps, cooling towers, ducting, piping, valves and associated equipment. Review IFC/shop drawings and coordinate with Civil, Electrical, Plumbing, Firefighting, ELV and BIM teams to resolve clashes and interfaces. Monitor HVAC subcontractors, manpower, materials, productivity and daily progress. Ensure proper installation of ducting, chilled-water piping, insulation, supports, equipment and associated services. Coordinate pressure testing, flushing, duct leakage testing, TAB and testing & commissioning activities. Ensure compliance with approved method statements, ITPs, QA/QC and HSE requirements. Raise/close WIR/IR, NCRs, punch points and inspection observations. Support HVAC pre-commissioning, commissioning and integrated testing, particularly for critical Data Center systems. Maintain progress reports, testing records, as-built drawings and handover documentation.

Desired Candidate Profile

Diploma/B.E./B. Tech in Mechanical Engineering / HVAC / relevant discipline. 6–10 years of relevant HVAC site execution experience. Data Center / Mission Critical / Large EPC project experience preferred. Strong knowledge of HVAC installation, chilled-water systems, ventilation and critical cooling systems. Experience with CRAH/CRAC units, chillers, cooling towers, pumps and associated controls preferred. Good understanding of ASHRAE standards, project specifications and applicable codes. Ability to read IFC, shop and MEP coordination drawings. Experience in subcontractor and site execution management. Proficiency in AutoCAD; BIM/Navisworks/Revit knowledge is an advantage. Strong coordination, problem-solving and site management skills. Employment Type Full-time

Ready to apply?

You are viewing this role on JobSphere AI. Applications are completed on the original employer / source website.

Apply Now

Opens the employer's site in a new tab

  • CompanyBranch of Sterling and Wilson Data Center Private
  • LocationRiyadh, Saudi Arabia
  • CategoryCybersecurity
  • SourceNaukrigulf
  • Listed1h ago

Related Cybersecurity jobs

More Cybersecurity